| Title |
Building |
Completed |
Cost |
Description |
|
Goodale Park |
2006 |
$2,089.00 |
Provide soil testing at (3) areas at Goodale Pond. |
|
Goodale Park |
2005 |
$130,720.00 |
Renovate tennis courts - 6 courts- Remove vegetation from cracks, fill and patch.
- Remove and replace net posts, nets and center tie downs.
- Powerwash, patch, crackfill and overlay 6 tennis courts.
- Remove fence fabric and replace, paint existing posts and rails (black)
- Colorcoat and stripe 6 courts. Plexipave surfacing - 2 year warranty
|
|
Goodale Park |
2005 |
$178,444.00 |
Removal and replacement of existing walks, the elimination of walks, the installation of new concrete walks, concrete curbing, foundations and one iron gate. Install brick paving on east and west terraces at shelterhouse. Installation of brick on the triangle plaza in place of concrete. Install concrete walk from gazebo to the east walk along park street. Modification EL 005700 for $3444 for feeding of tree roots by Davy tree company. |
|
(various sites) |
2005 |
$4,782.00 |
Remove and install new VCT tile w/4" vinyl base in main room and kitchen. |
|
Goodale Shelterhouse |
2003 |
$237,651.00 |
Enclose south porch. Add office, changing room, kitchen and storage room. Add AC to shelter and new addition. Upgrade electrical. Add roof over south patio area. 30 yr. shingle warranty. |
|
Goodale Park |
2003 |
$15,000.00 |
Replace deteriorated concrete walks in park. Also remove horseshoe pits. |
|
Goodale Shelterhouse |
2001 |
$1,020.00 |
Install 3 sets of handrails on 3 sets of steps near shelterhouse. |
|
Goodale Park |
2001 |
$115,000.00 |
Replace concrete sidewalks in and around park perimeter. |
|
Goodale Park |
2000 |
$67,351.00 |
Grind existing asphalt/gravel/shoot and chip lot. Pave new lot. Stripe and sign. Install concrete walk, curbing, brick crosswalk and electrical light bases and conduit. Install parking blocks. Install toilet screen and pad; dumpster pad and screen. Seed and mulch. |
|
Goodale Shelterhouse |
2000 |
$12,970.00 |
New electrical service at Goodale Park Shelterhouse. |
|
Goodale Park |
2000 |
$1,500.00 |
Install Flytown Historic Marker. |
|
Goodale Residence House |
1999 |
$616.00 |
Remove A-C pipe insulation from basement of residence prior to renovations. |
|
Goodale Park |
1998 |
$4,500.00 |
Reset and patch stone on west column. |
|
Goodale Park |
1998 |
$4,500.00 |
Repair to south entrance column. |
|
Goodale Shelterhousee |
1998 |
$9,760.00 |
Replace residence back porch. |
|
Goodale Park |
1998 |
$5,065.00 |
Sidewalk work at Goodale Park |
|
Goodale Park |
1998 |
$11,000.00 |
Install brick pavers at NW corner and north park entrances. Paid for by FOGP. |
|
Goodale Park |
1998 |
$4,636.00 |
Cleaning and sealing of Goodale bust/statue. |
|
Goodale Residence House |
1997 |
$17,728.00 |
Install ornamental iron fence, concrete walk. (Paid for by FOGP) |
|
Goodale Residence House |
1997 |
$9,760.00 |
Replace back porch of residence. (Half paid for by FOGP) |
|
Goodale Residence House |
1997 |
$30,000.00 |
Renovations to residence area. (Paid for by FOGP) |
|
Goodale Park |
1997 |
$10,000.00 |
Demolish existing Maintenance garages (2), level site and seed. |
|
Goodale Residence House |
1997 |
$2,978.00 |
Remove approx. 10 sf of aCM on ducts, paper insulation in electrical panel, 820 sf of asbestos containing floor tile (mastics were not asbestos). Done as part of contract for Blackburn Barnett Sayer Asbestos removal. |
|
Goodale Residence House |
1997 |
$9,000.00 |
Repair termite damage to floor, floor joists. |
|
Gazebo |
1996 |
$3,841.00 |
Paint gazebo. |
|
Goodale Park |
1995 |
$297,510.00 |
Demolition of existing concrete stone walls, fountain; new concrete walls and walk around lake, stone features around lake and out in lake, fountain with associated electrical and water supply, benches, seeding, planting. Additional work for 820 LF of new lake wall construction: $73,177. |
|
Goodale Park |
1995 |
$96,750.00 |
Repave roadways & parking, entry plazas, curb stops, resurface and stripe Dennison Avenue lot. |
|
Goodale Park |
1994 |
$43,912.00 |
Work includes the removal of existing playground equipment and the installation of new L.S. Playbooster and 6 place belt Arch Swingset (#100050). Wood fiber mulch delivered to site by contractor. Community removed existing woodchips and spread new mulch. |
|
Goodale Shelterhouse |
1994 |
$71,286.00 |
New lighting, int. & ext. painting, restrooms, ADA upgrade, new flooring, ceiling, new doors and windows, reroof, A/C, gas furnaces. |
|
Goodale Park |
1993 |
$67,205.00 |
Installation of playground equipment. 100% donation from Lever Bros. |
|
Goodale Park |
1993 |
$2,682.00 |
Install surfacing in playground. |
|
Goodale Park |
1992 |
$75,854.00 |
Installation of new park lighting system-13 park lights, lights on monument, 5 lights around lake. (1992 comm Quest $34,000; FOGP $17,517; City (ord 1596-91 $25,000) |
|
Goodale Park |
1992 |
$7,000.00 |
Clean, tuck point and seal stone walls and columns at four entrances. Sandblast and paint wrought iron at Goodale Blvd. entrance. |
|
Goodale Park |
1991 |
$90,000.00 |
Construct gazebo next to lake. Electric, Site work. $25,000 from Columbus Foundation. Albert Vargo (Marietta, OH) architect. Fee of $3000 paid by Friends of Goodale. |
|
|