Goodale Park Completed Projects

Click on a column header to sort.

Title Building Completed Cost Description
Goodale Park 2006 $2,089.00 Provide soil testing at (3) areas at Goodale Pond.
Goodale Park 2005 $130,720.00 Renovate tennis courts - 6 courts
  • Remove vegetation from cracks, fill and patch.
  • Remove and replace net posts, nets and center tie downs.
  • Powerwash, patch, crackfill and overlay 6 tennis courts.
  • Remove fence fabric and replace, paint existing posts and rails (black)
  • Colorcoat and stripe 6 courts. Plexipave surfacing - 2 year warranty
Goodale Park 2005 $178,444.00 Removal and replacement of existing walks, the elimination of walks, the installation of new concrete walks, concrete curbing, foundations and one iron gate. Install brick paving on east and west terraces at shelterhouse. Installation of brick on the triangle plaza in place of concrete. Install concrete walk from gazebo to the east walk along park street. Modification EL 005700 for $3444 for feeding of tree roots by Davy tree company.
(various sites) 2005 $4,782.00 Remove and install new VCT tile w/4" vinyl base in main room and kitchen.
Goodale Shelterhouse 2003 $237,651.00 Enclose south porch. Add office, changing room, kitchen and storage room. Add AC to shelter and new addition. Upgrade electrical. Add roof over south patio area. 30 yr. shingle warranty.
Goodale Park 2003 $15,000.00 Replace deteriorated concrete walks in park. Also remove horseshoe pits.
Goodale Shelterhouse 2001 $1,020.00 Install 3 sets of handrails on 3 sets of steps near shelterhouse.
Goodale Park 2001 $115,000.00 Replace concrete sidewalks in and around park perimeter.
Goodale Park 2000 $67,351.00 Grind existing asphalt/gravel/shoot and chip lot. Pave new lot. Stripe and sign. Install concrete walk, curbing, brick crosswalk and electrical light bases and conduit. Install parking blocks. Install toilet screen and pad; dumpster pad and screen. Seed and mulch.
Goodale Shelterhouse 2000 $12,970.00 New electrical service at Goodale Park Shelterhouse.
Goodale Park 2000 $1,500.00 Install Flytown Historic Marker.
Goodale Residence House 1999 $616.00 Remove A-C pipe insulation from basement of residence prior to renovations.
Goodale Park 1998 $4,500.00 Reset and patch stone on west column.
Goodale Park 1998 $4,500.00 Repair to south entrance column.
Goodale Shelterhousee 1998 $9,760.00 Replace residence back porch.
Goodale Park 1998 $5,065.00 Sidewalk work at Goodale Park
Goodale Park 1998 $11,000.00 Install brick pavers at NW corner and north park entrances. Paid for by FOGP.
Goodale Park 1998 $4,636.00 Cleaning and sealing of Goodale bust/statue.
Goodale Residence House 1997 $17,728.00 Install ornamental iron fence, concrete walk. (Paid for by FOGP)
Goodale Residence House 1997 $9,760.00 Replace back porch of residence. (Half paid for by FOGP)
Goodale Residence House 1997 $30,000.00 Renovations to residence area. (Paid for by FOGP)
Goodale Park 1997 $10,000.00 Demolish existing Maintenance garages (2), level site and seed.
Goodale Residence House 1997 $2,978.00 Remove approx. 10 sf of aCM on ducts, paper insulation in electrical panel, 820 sf of asbestos containing floor tile (mastics were not asbestos). Done as part of contract for Blackburn Barnett Sayer Asbestos removal.
Goodale Residence House 1997 $9,000.00 Repair termite damage to floor, floor joists.
Gazebo 1996 $3,841.00 Paint gazebo.
Goodale Park 1995 $297,510.00 Demolition of existing concrete stone walls, fountain; new concrete walls and walk around lake, stone features around lake and out in lake, fountain with associated electrical and water supply, benches, seeding, planting. Additional work for 820 LF of new lake wall construction: $73,177.
Goodale Park 1995 $96,750.00 Repave roadways & parking, entry plazas, curb stops, resurface and stripe Dennison Avenue lot.
Goodale Park 1994 $43,912.00 Work includes the removal of existing playground equipment and the installation of new L.S. Playbooster and 6 place belt Arch Swingset (#100050). Wood fiber mulch delivered to site by contractor. Community removed existing woodchips and spread new mulch.
Goodale Shelterhouse 1994 $71,286.00 New lighting, int. & ext. painting, restrooms, ADA upgrade, new flooring, ceiling, new doors and windows, reroof, A/C, gas furnaces.
Goodale Park 1993 $67,205.00 Installation of playground equipment. 100% donation from Lever Bros.
Goodale Park 1993 $2,682.00 Install surfacing in playground.
Goodale Park 1992 $75,854.00 Installation of new park lighting system-13 park lights, lights on monument, 5 lights around lake. (1992 comm Quest $34,000; FOGP $17,517; City (ord 1596-91 $25,000)
Goodale Park 1992 $7,000.00 Clean, tuck point and seal stone walls and columns at four entrances. Sandblast and paint wrought iron at Goodale Blvd. entrance.
Goodale Park 1991 $90,000.00 Construct gazebo next to lake. Electric, Site work. $25,000 from Columbus Foundation. Albert Vargo (Marietta, OH) architect. Fee of $3000 paid by Friends of Goodale.