| Project Title |
Building |
Year
Completed |
Site
Project
Cost |
Description |
| Soil Testing at Goodale Pond |
Goodale Park |
2006 |
$2,089 |
Provide soil testing at (3) areas at Goodale Pond. |
| Tennis Court Improvements (2005) |
Goodale Park |
2005 |
$130,720 |
Renovate tennis courts - 6 courts
- Remove vegetation from cracks, fill and patch.
- Remove and replace net posts, nets and center tie downs.
- Powerwash, patch, crackfill and overlay 6 tennis courts.
- Remove fence fabric and replace, paint existing posts and rails (black)
- Colorcoat and stripe 6 courts. Plexipave surfacing - 2 year warranty
|
| Concrete Walk Replacements |
Goodale Park |
2005 |
$178,444 |
Removal and replacement of existing walks, the elimination of walks, the installation of new concrete walks, concrete curbing, foundations and one iron gate. Install brick paving on east and west terraces at shelterhouse. Installation of brick on the triangle plaza in place of concrete. Install concrete walk from gazebo to the east walk along park street. Modification EL 005700 for $3444 for feeding of tree roots by Davy tree company. |
| Floor Improvements (2005) (various sites) |
Goodale Park |
2005 |
$4,782 |
Remove and install new VCT tile w/4" vinyl base in main room and kitchen. |
| Goodale Shelterhouse Renovations (2002) |
Goodale Park |
2003 |
$237,651 |
Enclose south porch. Add office, changing room, kitchen and storage room. Add AC to shelter and new addition. Upgrade electrical. Add roof over south patio area. 30 yr. shingle warranty. |
| Concrete Walk Replacement (2003) |
Goodale Park |
2003 |
$15,000 |
Replace deteriorated concrete walks in park. Also remove horseshoe pits. |
| Handrail Installation at Shelterhouse |
Goodale Park |
2001 |
$1,020 |
Install 3 sets of handrails on 3 sets of steps near shelterhouse. |
| Concrete Sidewalk Replacement (UTC) (2001) |
Goodale Park |
2001 |
$115,000 |
Replace concrete sidewalks in and around park perimeter. |
| Hardsurface Renovations-Goodale |
Goodale Park |
2000 |
$67,351 |
Grind existing asphalt/gravel/shoot and chip lot. Pave new lot. Stripe and sign. Install concrete walk, curbing, brick crosswalk and electrical light bases and conduit. Install parking blocks. Install toilet screen and pad; dumpster pad and screen. Seed and mulch. |
| Goodale Park Shelter Electric Improvements |
Goodale Park |
2000 |
$12,970 |
New electrical service at Goodale Park Shelterhouse. |
| Flytown Historic Marker Installation |
Goodale Park |
2000 |
$1,500 |
Install Flytown Historic Marker. |
| Asbestos Abatement Work at Goodale Residence |
Goodale Park |
1999 |
$616.10 |
Remove A-C pipe insulation from basement of residence prior to renovations. |
| Goodale Park Stone Column Repair |
Goodale Park |
1998 |
$4,500 |
Reset and patch stone on west column. |
| Stone Column Repair |
Goodale Park |
1998 |
$4,500 |
Repair to south entrance column. |
| Goodale Park Shelter Back Porch Replacement |
Goodale Park |
1998 |
$9,760 |
Replace residence back porch. |
| Goodale Park Sidewalk Renovations-1998 |
Goodale Park |
1998 |
$5,065 |
Sidewalk work at Goodale Park |
| Pedestrian Entrance Renovations |
Goodale Park |
1998 |
$11,000 |
Install brick pavers at NW corner and north park entrances. Paid for by FOGP. |
Goodale Statue/
Bust Restoration |
Goodale Park |
1998 |
$4,636 |
Cleaning and sealing of Goodale bust/statue. |
| Fence Installation at Residence |
Goodale Park |
1997 |
$17,728 |
Install ornamental iron fence, concrete walk.
(Paid for by FOGP) |
| Residence Back Porch Renovation |
Goodale Park |
1997 |
$9,760 |
Replace back porch of residence.
(Half paid for by FOGP) |
| Residence Renovations |
Goodale Park |
1997 |
$30,000 |
Renovations to residence area. (Paid for by FOGP) |
| Demolition of Maintenance Garages |
Goodale Park |
1997 |
$10,000 |
Demolish existing Maintenance garages (2), level site and seed. |
| Asbestos Floor Removal |
Goodale Residence |
1997 |
$2,978 |
Remove approx. 10 sf of aCM on ducts, paper insulation in electrical panel, 820 sf of asbestos containing floor tile (mastics were not asbestos). Done as part of contract for Blackburn Barnett Sayer Asbestos removal. |
| Residence Floor Repair |
Goodale Park |
1997 |
$9,000 |
Repair termite damage to floor, floor joists. |
| Gazebo Painting |
Goodale Park |
1996 |
$3,841 |
Paint gazebo. |
| Goodale Park Lake Renovation |
Goodale Park |
1995 |
$297,510 |
Demolition of existing concrete stone walls, fountain; new concrete walls and walk around lake, stone features around lake and out in lake, fountain with associated electrical and water supply, benches, seeding, planting. Additional work for 820 LF of new lake wall construction: $73,177. |
| Hardsurface Improvements-Goodale, Marion-Franklin, Driving Park |
Goodale Park |
1995 |
$96,750 |
Goodale Park: repave roadways & parking, entry plazas, curb stops, resurface and stripe Dennison Avenue lot. |
| Playground Improvements (1994) |
Goodale Park |
1994 |
$43,912 |
Work includes the removal of existing playground equipment and the installation of new L.S. Playbooster and 6 place belt Arch Swingset (#100050). Wood fiber mulch delivered to site by contractor. Community removed existing woodchips and spread new mulch. |
| Shelterhouse Renovations - Varioius |
Goodale Park |
1994 |
$71,286 |
New lighting, int. & ext. painting, restrooms, ADA upgrade, new flooring, ceiling, new doors and windows, reroof, A/C, gas furnaces. |
Playground Installation
(Lever Bros.) |
Goodale Park |
1993 |
$67,205 |
Installation of playground equipment. 100% donation from Lever Bros. |
| Playground Surfacing |
Goodale Park |
1993 |
$2,682 |
Install surfacing in playground. |
| Goodale Park Lighting Improvements-PHI |
Goodale Park |
1992 |
$75,854.50 |
Installation of new park lighting system-13 park lights, lights on monument, 5 lights around lake. (1992 comm Quest $34,000; FOGP $17,517; City (ord 1596-91 $25,000) |
| Goodale Park Stone Gates Restoration |
Goodale Park |
1992 |
$7,000 |
Clean, tuck point and seal stone walls and columns at four entrances. Sandblast and paint wrought iron at Goodale Blvd. entrance. |
| Goodale Park Gazebo Construction |
Goodale Park |
1991 |
$90,000 |
Construct gazebo next to lake. Electric, Site work. $25,000 from Columbus Foundation. Albert Vargo (Marietta, OH) architect. Fee of $3000 paid by Friends of Goodale. |
| Roof Renovation-Goodale Shelterhouse |
Goodale Park |
1985 |
$19,759 |
Shingle roof. |
| Playground Improvements - Goodale Park |
Goodale Park |
1978 |
$52,000 |
Construct new playground with play equipment, spray fountain, asphalt paving, site grading and seeding. |
| Tennis Court Construction |
Goodale Park |
1976 |
$33,600 |
Construct 4 tennis courts with fencing and colorcoating |
| Renovations to Shelterhouse 1974 |
Goodale Park |
1974 |
$52,400 |
Enclose for year-round use, new restroom facilities. |